Sunday, September 13, 2026
The Kashmir Glory
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • International
  • National
  • Opinion & Editorial
  • Top Stories
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • International
  • National
  • Opinion & Editorial
  • Top Stories
No Result
View All Result
The Kashmir Glory
No Result
View All Result

Deadlock over Singhpora–Vailoo tunnel project ends, Rs 3,567-cr project set to move ahead

KG News Desk by KG News Desk
September 12, 2026
in Kashmir
0
Deadlock over Singhpora–Vailoo tunnel project ends, Rs 3,567-cr project set to move ahead
Share on FacebookShare on Twitter

READ ALSO

Kokernag Hit-and-Run Case Solved; Accused Arrested, Vehicle Seized

Two dialysis machines non-functional at Kulgam hospital for 3 months

10.36-km twin-tube tunnel to connect Chhatroo with Vailoo; 60-month completion period

Srinagar: The long-pending Singhpora–Vailoo twin-tube tunnel project under Sinthan Pass is set to move ahead, with the National Highways & Infrastructure Development Corporation Limited (NHIDCL) inviting bids for its construction along the Kishtwar–Vailoo–Khanabal section of National Highway-244.

The project, estimated to cost Rs 3,567.51 crore, is aimed at providing an all-weather connectivity link between Kishtwar in the Chenab Valley and Anantnag in south Kashmir, offering an alternative to the treacherous Sinthan Top route that frequently remains closed during winter due to heavy snowfall.

According to a Notice Inviting Bid issued by NHIDCL, a copy of which lies with the news agency—Kashmir News Observer (KNO), the 38.611-km highway package will be executed in Engineering, Procurement and Construction (EPC) mode.

The package includes construction of a 10.331-km left tunnel tube and a 10.363-km right tunnel tube, along with approach roads and other associated infrastructure. The stipulated construction period is 60 months, followed by a 120-month maintenance period.

The project will connect Chhatroo in Kishtwar district with Vailoo in Anantnag district. The eastern approach from Chhatroo to the tunnel portal will cover 17.088 km, while the western approach towards Vailoo will extend for 11.160 km, including the portal section.

The eastern portal, proposed near Singhpora in Kishtwar district, will be located at an elevation of around 2,243 metres, while the western portal at Gadole will be at approximately 2,404 metres.

The tunnel will have a nine-metre carriageway, footpaths and dedicated emergency facilities. The two tubes will be interconnected through cross-passages at intervals of about 500 metres to facilitate pedestrian movement and emergency evacuation.

As per the project documents, 20 cross-passages, each 6.1 metres wide and 18.5 metres long, have been proposed.

The tunnel will be equipped with semi-transverse ventilation, fire detection and firefighting systems, CCTV surveillance, emergency communication facilities, traffic-control systems, lighting, drainage and waterproofing arrangements.

Fire hydrants will be installed at intervals of 250 metres, besides hose connections and fire extinguishers at shorter intervals.

The project package also includes construction of approach roads, bridges, viaducts, culverts, drainage systems, safety installations and other ancillary works.

A total of 21 major and minor bridges, viaducts and viaduct-cum-bridge structures have been proposed, with the longest being a 1,345-metre viaduct at design chainage 139+660.

The approach roads will be developed as two-lane highways with paved shoulders. The project also provides for roadside and catch drains extending over 26 km and 28 km, respectively.

The tunnel has been proposed to comply with relevant Indian and international standards, including applicable IRC guidelines for road tunnels, CIE standards for tunnel lighting and NFPA provisions relating to fire safety.

The Vailoo–Singhpora tunnel project, approved in 2017 and reaffirmed in 2021, has faced repeated delays over the years.

Once completed, the tunnel is expected to provide a reliable all-weather alternative to the Sinthan Top route, improve connectivity between Kashmir and the Chenab Valley, reduce travel time and facilitate greater movement of people and goods.

The project is also expected to give a boost to tourism, trade and economic activity in both regions while strengthening strategic and inter-regional connectivity along NH-244.

Share this:

  • Post
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Telegram (Opens in new window) Telegram
  • Tweet
  • Email a link to a friend (Opens in new window) Email

Like this:

Like Loading…

Related Posts

Police File 13 Applications for Bail Cancellation in UAPA Cases In Shopian; Action Aimed at Dismantling Terror Ecosystem
Kashmir

Kokernag Hit-and-Run Case Solved; Accused Arrested, Vehicle Seized

September 13, 2026
Two dialysis machines non-functional at Kulgam hospital for 3 months
Health

Two dialysis machines non-functional at Kulgam hospital for 3 months

September 13, 2026
Saffron growers decry ‘worst season’ in decades with less than 10% harvest
Kashmir

Saffron replanting picks up pace in Pampore as farmers avail JKCIP support

September 13, 2026
CIK Conducts Raids at Multiple Locations in Kashmir Valley
Kashmir

CIK Conducts Raids At Multiple Locations In Shopian, Kulgam

September 13, 2026
Mother-in-law of Imam Jama Masjid Srinagar passes away
Kashmir

Woman collapses at Baramulla railway station, dies

September 12, 2026
35 Sheep Stolen from Poor Farmer’s Cowshed, Police Launch Investigation
Kashmir

J&K Police arrests 03 drug peddlers; contraband substances recovered

September 12, 2026
Load More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Designed By Window Technolgies

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • National
  • International
  • Opinion & Editorial
  • Sports
  • Top Stories
  • E-Paper

Designed By Window Technolgies

Login to your account below

Forgotten Password?

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
%d