Saturday, May 2, 2026
The Kashmir Glory
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • International
  • National
  • Opinion & Editorial
  • Top Stories
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • International
  • National
  • Opinion & Editorial
  • Top Stories
No Result
View All Result
The Kashmir Glory
No Result
View All Result

Highway Remains Closed On 5th Day; Trial Run On Bailey Bridge On Jan 16

KG News Desk by KG News Desk
January 15, 2021
in Latest
0
Highway Remains Closed On 5th Day; Trial Run On Bailey Bridge On Jan 16
Share on FacebookShare on Twitter

Jammu, Jan 15 (GNS):  The Jammu-Srinagar, the only road link connecting Kashmir Valley with the outside world, remained closed for traffic on the fifth running day on Friday.

READ ALSO

Around 2,000 J&K Umrah pilgrims stranded in Middle East: Travel operators

Diya D, Ragav S (IPS) Officers Transferred from J&K to Puducherry

The 260-kilomter thoroughfare was closed at 6:20 p.m. on January 10 after retaining wall of key bridge collapsed suddenly.

 “Jammu-Srinagar highway shall remain closed due to sudden collapse of retaining wall of a bridge near Kela Morh, Ramban, repairing work is going on.  However, Jammu-Doda-Kishtwar, Jammu-Ramban, Gool Sangaldan, Magerkot- Banihal, and Banihal-Qazigund stretches are through for local traffic,” a traffic department official told GNS, adding, “People are requested to take their journey accordingly.”

While there is no optional carriageway available nearby, the Border Roads Organization (BRO) has almost completed the construction of a Bailey Bridge to restore the traffic on the highway. Officials said the make-shift bridge would undergo trial run on Saturday.

Meanwhile, Deputy Commissioner (DC), Ramban, Nazim Zai Khan and Chief Engineer BRO, Brigadier IK Jaggi inspected progress of construction work of Bailey bridge besides repair work of damaged concrete bridge, here at Kela Morh.

Additional Deputy Commissioner, Harbans Lal; Project Director, NHIA, Parshotam Kumar; ASP, Rajni Sharma and several other officers of BRO and the construction agencies were present on the occasion.

After taking stock of the progress of the work, the deputy commissioner informed that construction of Bailey bridge is nearing completion and the trial run would be conducted on Saturday before opening it for traffic.

He said that the construction of the Bailey bridge is going on round the clock and substantial part of the bridge launching work was completed by Friday morning. He said that the perishable supplies have been transshipped and sent to their destinations.

The Chief Engineer BRO informed that the work is in progress as per plan.  “BRO has put all the resources available for completing the bridge. Work is going on at war footing as all men and machinery have been put to use. Hopefully, by tomorrow (Saturday) evening the Bailey bridge will be completed and ready for traffic,” he informed. Sources in the administration told GNS that successful launching or otherwise of the bridge will be known after the trial run expected anytime in the afternoon on January 16.  

Meanwhile, Civil QRT Ramban, Banihal, Ramsu and other organizations are helping the pedestrians to by-pass the damaged portion at Kela Morh safely, officials said. (GNS)

Share this:

  • Post
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Telegram (Opens in new window) Telegram
  • Tweet
  • Email a link to a friend (Opens in new window) Email

Like this:

Like Loading...

Related Posts

Flight Disruptions Leave J&K Umrah Pilgrims Awaiting Return
Jammu and Kashmir

Around 2,000 J&K Umrah pilgrims stranded in Middle East: Travel operators

March 5, 2026
Diya D, Ragav S (IPS) Officers Transferred from J&K to Puducherry
Latest

Diya D, Ragav S (IPS) Officers Transferred from J&K to Puducherry

January 24, 2026
Centre- Ladakh talks to resume on Feb 04 in New Delhi
Latest

Centre- Ladakh talks to resume on Feb 04 in New Delhi

January 16, 2026
Best Farewell Accorded to Executive Engineer KPDCL Pulwama
Kashmir

Best Farewell Accorded to Executive Engineer KPDCL Pulwama

December 29, 2025
“Vijay Diwas”Lieutenant Governor unveils 108-ft high mast National Flag at Kachrial
Latest

“Vijay Diwas”Lieutenant Governor unveils 108-ft high mast National Flag at Kachrial

December 16, 2025
Two arrested from J-K’s Kupwara over allegations of espionage: Arunachal Pradesh police
Kashmir

Two arrested from J-K’s Kupwara over allegations of espionage: Arunachal Pradesh police

December 11, 2025
Load More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Designed By Window Technolgies

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • National
  • International
  • Opinion & Editorial
  • Sports
  • Top Stories
  • E-Paper

Designed By Window Technolgies

Login to your account below

Forgotten Password?

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
%d