Friday, April 17, 2026
The Kashmir Glory
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • International
  • National
  • Opinion & Editorial
  • Top Stories
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • International
  • National
  • Opinion & Editorial
  • Top Stories
No Result
View All Result
The Kashmir Glory
No Result
View All Result

₹4.95 Crore Mehjoor Nagar Bridge Hit by Theft, Finials Stolen, Electrical Units Tampered

KG News Desk by KG News Desk
April 17, 2026
in Kashmir
0
₹4.95 Crore Mehjoor Nagar Bridge Hit by Theft, Finials Stolen, Electrical Units Tampered
Share on FacebookShare on Twitter

Srinagar, April 17: A recently constructed pedestrian footbridge in Mehjoor Nagar area of Srinagar has come under scrutiny after reports of theft, vandalism, and safety concerns, including missing metal components and tampering with electrical infrastructure.

The footbridge, built at a reported cost of ₹4.95 crore by the Lakes and Rivers Waterways Development (LRWD) under the Srinagar Municipal Corporation (SMC), has seen the disappearance of several decorative metal spheres installed atop its railings. Visual evidence from the site shows multiple railing posts left exposed, with their spherical finials missing.

READ ALSO

Rapid conversion of paddy fields raises food security concerns in Kashmir

Galander–Pulwama link road condition worsens each year; temporary repairs inadequate, say residents

Locals told the news agency Kashmir News Trust that at least 32 such metal spheres were stolen during the night, pointing to a pattern of organized theft rather than isolated damage.

The incident has also raised concerns over safety after an electrical unit installed near the bridge, meant for lighting, is in open and unsecured. 

In addition, a nearby electric pole shows signs of tampering, with loose nuts and partially removed bolts, suggesting an attempted theft or interference that could compromise structural stability.

The developments highlight broader concerns around maintenance, monitoring, and protection of newly created public infrastructure in the city.

Local residents expressed shock over the damage, stating that the removal of metal components has not only disfigured the aesthetic appeal of the bridge but also reflects poorly on public responsibility. Some residents suspected the involvement of drug addicts, though no official confirmation has been made.

“There is visible damage to public property, and people are worried about safety as well,” a local inhabitant said, pointing to the open electrical installations and tampered fittings.

Locals have also questioned the absence of surveillance measures at the site, particularly in light of the project’s cost. Concerns were raised over the lack of CCTV cameras or monitoring systems that could deter such incidents or help identify those responsible.

An appeal has been made by locals to scrap dealers and metal buyers to alert police if such stolen items are brought for sale, warning that those involved in purchasing or facilitating sale of public property could face legal consequences.

The incident has also triggered broader reflection among locals about civic responsibility, with many describing the situation as a “serious lapse” and expressing concern over vandalism of public infrastructure.

There are also apprehensions that other components, including the bridge’s electrical or lighting system, could be targeted next if preventive measures are not taken promptly.

The Mehjoor Nagar footbridge was inaugurated after its foundation stone was laid on August 25, 2022, in the presence of senior municipal officials and local representatives. [KNT]

Share this:

  • Post
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Telegram (Opens in new window) Telegram
  • Tweet
  • Email a link to a friend (Opens in new window) Email

Like this:

Like Loading...

Related Posts

Rapid conversion of paddy fields raises food security concerns in Kashmir
Kashmir

Rapid conversion of paddy fields raises food security concerns in Kashmir

April 17, 2026
Galander–Pulwama link road condition worsens each year; temporary repairs inadequate, say residents
Kashmir

Galander–Pulwama link road condition worsens each year; temporary repairs inadequate, say residents

April 17, 2026
Kashmir Braces Up For Snow, People Advised To Avoid Highway Travel
Kashmir

Traffic Advisory Issued for Handwara Amid Mega Nasha Mukt Bharat Rally Today

April 17, 2026
Power shutdown
Kashmir

KPDCL Announces Scheduled Power Shutdowns in Parts of Kashmir

April 16, 2026
Lieutenant Governor attended IFFCO’s Women Farmers Conference at Srinagar
Kashmir

Lieutenant Governor attended IFFCO’s Women Farmers Conference at Srinagar

April 16, 2026
Religious Leaders mobilized for Drug Prevention in landmark Nasha Mukt Abhiyan at Bandipora
Kashmir

Religious Leaders mobilized for Drug Prevention in landmark Nasha Mukt Abhiyan at Bandipora

April 16, 2026
Load More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Designed By Window Technolgies

No Result
View All Result
  • Home
  • Kashmir
  • Jammu
  • Srinagar City
  • National
  • International
  • Opinion & Editorial
  • Sports
  • Top Stories
  • E-Paper

Designed By Window Technolgies

Login to your account below

Forgotten Password?

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
%d